cs-zinc@guangdongcs.com·WhatsApp +86 189 3353 3606We reply within 12 hours

Manufacturing

How Zinc Alloy Enamel Pins Are Made

This guide helps you prepare an enamel pin project for quotation, artwork review and production approval. It focuses on the information a buyer and production team need to agree, rather than treating a concept image as a finished specification.

CS-ZINC offers zinc alloy and brass enamel pins. This article describes a zinc alloy route; confirm the process separately for a brass pin.

Start from production artwork

The proposed CS-ZINC route for a zinc alloy pin starts with the product brief and reviewed artwork. The drawing should define the outline, colour areas, raised or recessed features, back fitting and thickness. The precise production route must be agreed for that design.

Connect forming and decoration

Die casting, surface finishing and decoration need to be considered as a sequence for the product. Enamel, paint and UV printing are different ways to discuss the desired result. Do not assume that a photograph proves which process was used; name the agreed process on the specification.

Use the sample to close decisions

Check the decorated front and attached back fitting together. If a colour, position or detail changes during sampling, update the production drawing and revision. The inspection reference should be the agreed result, including the fitting and packaging, rather than the first concept image.

From Casting to the Specified Finish

A zinc alloy route commonly includes casting, trimming, surface preparation and finishing. The exact sequence depends on the approved product. Confirm the decoration and any attachments with the drawing, then check the complete sample rather than approving only an unfinished metal part. The order needs its own approved process and inspection requirements.

Set a Realistic Schedule

For CS-ZINC projects, typical stages are 3–5 working days for artwork, 7–15 working days for sampling and tooling together, and 20–35 working days for bulk production. The timing basis is the payment date. Confirm the sequence and order schedule with the CS-ZINC team; transport time is separate.

Discuss Your Project

Explore the CS-ZINC enamel pins product page, review craft and finishes, or send your project brief. Include quantity per design, dimensions and the decisions you still need help with. We reply to new enquiries within 12 hours; a complete quotation may require further details.

View Custom Enamel PinsSend Your Project Brief

Back to Blog